240z Wheel Wells Finished, Seam Sealed, and Panels Paint Prepped

In today’s episode we finish off the floor pans and wheel wells, we seam seal all the seams on the new flooring, and we paint prep the body panels.

❱ Shop – http://bisforbuild.com/
❱ Game – http://disfordrift.com
❱ Patreon – http://www.patreon.com/user?u=3364742
❱ Facebook – http://facebook.com/bisforbuild
❱ Instagram – http://instagram.com/bisforbuild
❱ Twitch – https://www.twitch.tv/bisforbuild

Music:
Fareoh – Cloud Ten

source

Author: avnblogfeed

ANGELHOUSE © 2009 - 2022 | HOSTING BY PHILLYFINEST369 SERVER STATS| & THE IDIOTS ROBOT AND CONTROL INC. |(RSS FEED MODULE)| ALL YOUTUBE VIDEOS IS A REGISTERED TRADEMARK OF GOOGLE INC. THE YOUTUBE CHANNELS AND BLOG FEEDS IS MANAGED BY THERE RIGHTFUL OWNERS (AVNBLOGFEED.COM)